A bid is more than a price. It is a written promise about what work will be done, how it will be paid for, and when it will be finished. A good bid lets you compare contractors fairly. A weak bid hides the details until they become your problem.

A clear scope of work

The scope says exactly what the contractor will do. "Redo kitchen" is not a scope. A scope says which cabinets, which counters, which fixtures, and who supplies each. It also says what is not included.

Give every contractor the same list of jobs. If each one bids on a different scope, you cannot compare the numbers.

Line-by-line pricing

Ask for a price on each job, not one total. Line-by-line pricing shows you where bids differ. It also shows when a contractor left something out. Ask whether materials are included, and who buys them.

Here is an example with round numbers. Two contractors bid on the same five jobs:

JobBid ABid B
Demolition and haul-out$3,000$2,200
Kitchen$7,000$6,500
Bathrooms$7,400$7,000
Flooring$6,050$5,800
Paint$6,400Not included
Total$29,850$21,500

Bid B looks $8,350 cheaper. But it left out paint. Add paint at Bid A's price and Bid B becomes $27,900, only $1,950 lower. Without line items, you would never have seen that.

How to compare bids fairly

Put the bids in one table, job by job. Mark any job a contractor left out, and any job priced much higher or lower than the rest. Then ask about each gap. A low number is good only when the same work is included. Also compare the schedule and the payment terms, because a cheaper bid with worse terms can cost more in the end.

A schedule

The bid should give a start date, a finish date, and key steps in between. Time costs you money on a flip. Every extra week means more interest, insurance, and utilities. Ask what could delay the work, such as permits or material lead times.

Payment and draw terms

A draw is a payment made as work is finished. Tie each payment to completed work, not to dates on a calendar. A fair plan might pay after demolition, after rough work, and after the final job. Keep a final payment until the work is done and checked.

Be careful with big deposits. Ask what the deposit pays for. A small up-front amount for materials is common. A large payment before any work starts leaves you exposed.

License and insurance

Ask the contractor to show their license where one is required, and proof of insurance. Ask for proof, not just a promise. Rules differ by place, so check with your attorney or local authority about what applies to you.

A change-order process

Scope changes will happen. A rotten subfloor shows up. You pick a better tile. What matters is how the change is handled. A good bid says changes must be requested in writing, with a price and a time impact, and approved before the work is done. Without that rule, "extras" show up at the end.

Red flags

  • A single lump-sum price with no breakdown.
  • A price far below the others with no explanation.
  • A large deposit demanded before work starts.
  • Pressure to decide today.
  • Unwillingness to show a license or insurance when asked.
  • No written scope or schedule.
  • Cash-only terms and no paperwork.

Common mistakes

  • Picking the lowest total without checking what is missing.
  • Letting contractors bid different scopes.
  • Paying ahead of the work.
  • Accepting verbal changes.
  • Collecting only one bid.

How GenesisOS does it

In Rehab Projects, you can send a bid request for a set of jobs to two or more contractors. You record each bid line by line, then compare them side by side. When you pick a winner, you accept that bid. A bid request is Open, Awarded, or Cancelled.

Payments are handled as Draws. Each draw is tied to one job's completed work and moves from Requested to Approved to Paid, or to Declined. The approval checklist covers completion photos reviewed, work marked complete, and inspection done. Change Orders are Pending, Approved, or Rejected. Contractors are kept in your CRM contacts.

Key takeaways

  • Give every contractor the same scope and ask for line-by-line prices.
  • Compare bids on what is included, not only the total.
  • Tie payments to completed work and keep a final payment until the end.
  • Ask for proof of license and insurance.
  • Require written, approved change orders.